Skip to main content
New septic systems and septic repair across Bosque CountyText us: (254) 326-2756
Bosque County SepticMeridian · Clifton · Valley Mills (254) 326-2756
Menu

Home / New septic systems

New septic systems for Bosque County land

Building on family land, a new lot or a few acres outside town? We take a new system from bare ground to the county sign-off, conventional or aerobic.

How a new system comes together

  • Site and soil evaluation. Texas requires a site evaluation before a system is designed. On Bosque County ground it usually tells you how deep the rock is and what kind of system the lot can take.
  • Design. The system is sized for the house, mainly by the number of bedrooms and the square footage, and laid out around setbacks from wells, property lines and water.
  • County permit. We help put the permit package together for the Bosque County septic office in Meridian. Nothing gets dug until the permit is approved.
  • Install. We set the tank, run the lines and build the drain field, or set the aerobic unit and lay out the spray area.
  • County sign-off. The county checks the install before it's covered up.

Conventional or aerobic

Where there's enough suitable soil, a conventional tank and trench field is the simplest system to live with. Where rock sits close to the surface, the design often moves to an aerobic system or another alternative. That call comes from the evaluation, not a guess from the road, and it's the biggest single factor in cost. See aerobic system installation for how those go in.

Building on family land or a new lot

Many of our new systems go in on land that's been in a family for years, or on a few acres somebody just bought outside town. Bring us in early, before the house plans are final, so the system and the house don't end up fighting over the best ground.

What to have ready when you call

  • The property address or legal description
  • Where the house will sit, if you know
  • Number of bedrooms and rough square footage
  • Where any water well is or will be, since the rules set distances between wells and septic parts

TCEQ's OSSF permit page explains the state side of the process.

Building out here, or got a system that quit? Call or text us.